Project Details

Grid Connected Solar

Project Location

Katrina & Jake, Chirnside Park, Victoria

Project Category

We were asked to provide a solution to address options to lower very large quarterly power bills at this beautiful acreage property in the hills of Chirnside Park.

The property includes a fully electric pool, two heat pump hot water systems, electric cooking, a 16kw 3-phase reverse-cycle ducted heating and cooling system, and a large shed/office.

Fourth Phase Electrics designed, supplied and installed a massive 19.9kw 3-phase high-quality solar system, using Trina panels mounted on Clenergy racking, paired with a 20kw 3 phase Fronius inverter.

This has helped to offset their huge bills by over 50%, and with future growth expected in their electrical load, we have added an oversized inverter so that more panels can easily be added when required.

Power your home with smart, efficient solar and off-grid solutions built for the future.

Other Projects

100% Guaranteed Satisfaction. Dedicated to superior customer service, backed up by our warranty and supported by our workmanship.

Why Fourth Phase

Respected and trusted

Highly qualified A Grade Electricians

Quality workmanship

Total project management

For all general enquiries contact us today

The Fourth Phase Electrics team is ready to assist with all your electrical needs, ensuring reliable service every step of the way.

Location

46/65-67 Canterbury Road
Montrose VIC 3765, Australia